Subdivision process starts
I have received a letter from the surveyor with an aerial photo of the house and block, they have included 2 versions of how the subdivision could look.
There is a car port behind the house and the two versions include keeping the car port in its original position or moving it. If I keep the first option the second block will be very small. I have decided to move the car port and this will make both blocks similar in size.
I have to pay $364 to the Shire for the Planning application fee.
Subdivision costs to date $1794
